LO206 Change Over Service
Our Change Over service is the best option for taking a non-Kinetic engine and blueprinting it for performance optimization according to Kinetic standards.
Our service includes tear down, inspection, blueprinting, re-assembly, and dyno-tuning and requires 6-8 weeks for service to be completed from the date engine is received.
If replacement parts are needed upon inspection, member will be contacted to discuss the specifics and cost.
Member is responsible for shipping.
Liability Disclaimer: we are not responsible nor liable for any loss or damage incurred as a result of the use of the engine.
Our Change Over service is the best option for taking a non-Kinetic engine and blueprinting it for performance optimization according to Kinetic standards.
Our service includes tear down, inspection, blueprinting, re-assembly, and dyno-tuning and requires 6-8 weeks for service to be completed from the date engine is received.
If replacement parts are needed upon inspection, member will be contacted to discuss the specifics and cost.
Member is responsible for shipping.
Liability Disclaimer: we are not responsible nor liable for any loss or damage incurred as a result of the use of the engine.
Our Change Over service is the best option for taking a non-Kinetic engine and blueprinting it for performance optimization according to Kinetic standards.
Our service includes tear down, inspection, blueprinting, re-assembly, and dyno-tuning and requires 6-8 weeks for service to be completed from the date engine is received.
If replacement parts are needed upon inspection, member will be contacted to discuss the specifics and cost.
Member is responsible for shipping.
Liability Disclaimer: we are not responsible nor liable for any loss or damage incurred as a result of the use of the engine.